Warburton Bike Park in 2026: Every Trail Open Now (70km and Counting)
Warburton Bike Park has 30 named trails across roughly 70 km of open singletrack, 70 km east of central Melbourne, with a shuttle running to the summit of Mt Tugwell since 4 April 2026. Thirteen months ago it had 30 km and no uplift. That's the fastest a network has grown in this country since Derby.
Almost everything written about the place is stuck at one of three moments: the July 2025 opening, the April 2026 shuttle launch, or a tourism listing that hasn't been touched since. Here's what's actually on the ground now — every trail, every grade, every length — plus a straight answer on the question the marketing copy dodges, which is whether a genuine first-timer should be riding here at all.
Quick picks
- Best single descent: Warpij, 3.0 km of old-school gravity with a steep technical finish
- The climb everyone talks about: Earn Ya Ferns, 8.2 km through fern gullies and creek crossings — the longest trail in the park
- Newest black: Shred Galah, 1.4 km, hand-built, raw, with a rock garden that isn't machine-smoothed
- Best first lap: Rubber Stamp up from Wesburn, then Zinglefun back down
- Shuttle: to the top of Mt Tugwell, about 650 m of descent, or a 14 km climb if you'd rather earn it
- Trailhead: Wesburn Park — free parking, toilets, showers, bike wash, pump track
- Drive from Melbourne CBD: about 90 minutes
- Not for: absolute beginners. More on that below
Warburton Bike Park at a glance
| Named trails in the operator directory | 30 (11 green, 14 blue, 5 black) |
| Open network | 70 km+ (operator homepage says 80 km+) |
| Longest trail | Earn Ya Ferns, 8.2 km |
| Shuttle descent | ~650 m from Mt Tugwell |
| Self-powered climb to the summit | 14 km+ |
| Main trailhead | Wesburn Park |
| Parking | Free at Wesburn Park |
| Toilets, showers, bike wash, pump track | Yes, all at Wesburn Park |
| Shuttle days | 7 days in school holidays; weekends off-peak |
| Trail builder | World Trail |
| Managed by | Yarra Ranges Council |
| Opened | 19 July 2025 (Stage 1A, 30 km) |
| Target network | 160 km with 800 m of vertical |
So how big is Warburton Bike Park — 70 km or 80 km?
Depends which page you read, and both figures come from the same operator.
The trail directory heads its page with 70 km of trails available. The homepage says over 80 km are now open. Add up the individual lengths of all 30 trails in that same directory and you get 85.5 km — 33.1 km of green, 43.4 km of blue, 9.0 km of black.
None of those numbers is wrong, exactly. A directory listing includes trails that are signed and named but not currently open to ride, and Warburton closes sections routinely for works and for weather. The 70 km figure is the conservative "you can ride this today" answer; 85.5 km is what's been cut and named. If you're driving out for a day, plan around 70 and treat the rest as upside.
The 160 km number is a different thing again — that's the completed vision, and the 800 m of vertical attached to it is the finished build-out, not what the shuttle drops you at right now. Australian Mountain Bike reported a 125 km "Southern Network" on track for 2027. Warburton is a park quoted in future tense more often than present tense, which is why an actual trail list is worth having.
Every trail open now, by grade
Lengths are the operator's own. Grades are to international standards, which matters — see the beginner section below.
Green (11 trails, 33.1 km)
| Trail | Length | What it is |
|---|---|---|
| Bitta This Bitta That | 5.7 km | Climb to the Mt Little Joe summit through fern gullies |
| Uptown Flow | 5.6 km | Long climb from the rail trail into the network |
| Warburtron | 5.2 km | The new beginner "airflow" trail — gentle berms, rollable jumps |
| Rubber Stamp | 3.0 km | Climb from Wesburn trailhead through dry forest |
| Milling Around | 2.8 km | Loop around the western side of Mt Little Joe |
| Settle Down | 2.7 km | Descent off the Mt Little Joe summit |
| Runaway Bride | 2.6 km | Flowing descent through natural gullies |
| Hop Scotch | 1.6 km | Flow — berms, rollers, jumps |
| Zinglefun | 1.5 km | Flow descent back to Wesburn Park |
| 3 Owls | 1.3 km | Gentle descent through open bushland |
| Tools Down | 1.1 km | Shortcut off Bitta This Bitta That |
Blue (14 trails, 43.4 km)
| Trail | Length | What it is |
|---|---|---|
| Earn Ya Ferns | 8.2 km | The main climbing trail — fern gullies, creek crossings |
| Fubba Gubba | 5.8 km | Flow blended with technical sections |
| Captain Crayfish | 4.6 km | Jumps, berms and rock rolls, good views |
| Hey Hey My My | 4.2 km | Steep climb, then fast and flowy with jumps |
| Onya Lyre | 3.5 km | Smooth machine-built track through dry bushland |
| Mad Max | 3.3 km | New in April 2026 — sculpted berms, progressive jumps |
| Wattsup | 2.8 km | Steady climb on smooth switchbacks |
| Mine Your Manners | 2.2 km | Climbing link between junctions |
| Ripple Effect | 1.7 km | Quick descent from the Mt Little Joe summit |
| Yankee Jim | 1.7 km | Fern gully traverse with water crossings |
| Cupla Weeks | 1.6 km | Link trail, gentle climbing |
| The Riddler | 1.4 km | Big berms, well-placed jumps |
| Gnarnia | 1.3 km | Playful, multiple line options |
| Mind Drift | 1.1 km | Gentle gradient around Mineshaft Hill |
Black (5 trails, 9.0 km)
| Trail | Length | What it is |
|---|---|---|
| Warpij | 3.0 km | Old-school gravity, steep technical finish |
| Barefoot Wizard | 2.2 km | Off-camber, rock gardens, proper technical gravity |
| Scrubaroo | 1.8 km | Starts variable, builds to technical rock |
| Shred Galah | 1.4 km | New in April 2026 — hand-built, raw, one serious rock garden |
| Acka Dacka | 0.6 km | Short, steep, flowy berms and jumps |
Nine kilometres of black across a 70 km network is a thin slice, and it's the honest limit on Warburton right now. Gravity riders coming from Buller or Thredbo will run out of new black inside a single shuttle day. The blues, though, are the deepest part of the park and several of them ride harder than blue does elsewhere.
What are the new trails — Shred Galah, Mad Max and Warburtron?
These three opened with the expansion on 4 April 2026 and they're the ones worth going out of your way for.
Shred Galah is 1.4 km of hand-built black. That's the key word — hand-built, not machine-groomed, so it keeps the raw character and the rock garden partway down hasn't been sanitised. AMB spells it "Shred Gallah"; the operator's own directory spells it with one L, after the bird.
Mad Max is the opposite approach: 3.3 km of machine-built blue with sculpted berms and jumps that build progressively, so you can roll the whole thing the first lap and start sending sections on the second. It's the trail most people will ride four or five times in a shuttle day.
Warburtron is 5.2 km of green "airflow" — the operator's term for beginner-grade trail with rolling jumps and gentle berms rather than the flat, featureless green you get at older networks. If you're bringing kids or a partner who's newer to jumps, this is the trail that justifies the drive.
How do the Warburton shuttles work?
The shuttle picks up at Warburton and at Wesburn Park Trailhead and drops at the summit of Mt Tugwell, the highest point in the park. From there it's roughly 650 m of descent back down. The alternative is a climb of 14 km or more, which is a real ride in itself and part of why the uplift changed the park's character so completely.
Buses run continuously — you join the queue and take the next one, with unlimited runs for the duration of your pass. Four pass types: full day, morning half day (9:00am–12:00pm), afternoon half day (1:00pm–4:00pm), and a Single Uplift Shuttle Pass from